PLAN THE LAST MILE
Ready for the day it arrives.
Delivery and installation depend on your destination, access and project scope. Confirm these details before an order is finalized.
Destination & access
Provide the delivery address, receiving contact, available hours, stairs, elevators and any building restrictions.
Freight or installation
Freight delivery and placement/installation are different scopes. Confirm unloading, inside delivery, assembly and removal responsibilities in writing.
Timing & readiness
Coordinate the arrival window with site readiness. Do not assume a fixed delivery date until the project team confirms it.
Inspect on arrival
Check the shipment and record any visible damage or missing items. Contact your project team with photos and order details.
Contact your teamUS BOOTHS / PRACTICAL BUYER GUIDE
Restaurant booth delivery and installation planning
Freight delivery and installation are different services. Confirm the destination, receiving conditions and each party’s responsibility in the approved scope. A nationwide shipping inquiry does not establish nationwide installation or a local US Booths factory.
Reviewed · US Booths editorial guidance
Describe the receiving site
Supply the exact address, ZIP, receiving contact and hours. Identify commercial or residential access, loading docks, liftgate needs, stairs, elevators, parking restrictions and building rules. Document the path from the truck to the final seating area.
Assign every handoff
Identify who unloads, moves furniture inside, unpacks, assembles, places, anchors and removes packaging. Confirm wall or floor preparation and site-readiness responsibilities. Do not assume a freight driver provides installation.
Inspect and reconcile the shipment
Follow the carrier’s and seller’s documented receiving procedure. Record visible damage and missing items, retain supporting photos and packaging as directed, and promptly contact the project team. Avoid inventing a universal claim deadline; use the actual order terms.
Compare the decisions that matter.
| Service | Agree in writing | Site information |
|---|---|---|
| Freight | Transport to agreed delivery point | Address and receiving conditions |
| Unloading | Equipment and responsible party | Dock, liftgate and access |
| Inside delivery | Move into the building | Doors, turns, stairs, elevators |
| Installation | Assembly, placement or anchoring as scoped | Site preparation and responsibility |
Questions & answers.
Does booth delivery include installation?
Only if the approved scope includes it. Confirm unloading, inside delivery, placement, assembly, anchoring and packaging removal separately.
Link to this answerCan you ship to my state?
Send the delivery ZIP and project details so the team can confirm options. Do not assume service availability or a local workshop from a national website.
Link to this answerWhat if a booth does not fit through the door?
Resolve the access route before ordering. Provide clear openings, turns and elevator dimensions; ask whether the selected construction allows site assembly.
Link to this answerWhen can I book an installation date?
Coordinate the site-readiness and delivery milestones with the project team. A target opening date is not a confirmed production or installation appointment.
Link to this answerWhat should I do if furniture arrives damaged?
Use the actual order and carrier receiving instructions, document the condition and contact the project team promptly. Keep the packaging or other evidence as instructed.
Link to this answerDo you have a workshop in every city you serve?
No such assumption should be made. Check the published locations page and confirm the supplier, shipping origin and installation arrangements for your specific project.
Link to this answer